The builders on site
Filling inside the foundation with sand to raise the floor level
Compacting the sand
The plumbers have been and put in the underfloor pipes for drains, toilets, baths, showers, etc. Now they are laying polystyrene for insulation.
Laying reinforcing for the concrete pad that will be our floor.